
WHAT IS CABINET REFACING?
KEEP THE CABINETS. CHANGE THE LOOK.
Cabinet refacing transforms the visible exterior of your existing cabinetry while keeping the cabinet boxes and layout you already have.
Existing doors and drawer fronts are replaced with new custom-made ones, exposed cabinet surfaces are professionally refaced or finished, and new hinges, hardware and selected components complete the transformation.




WHY CABINET REFACING?
REFACE VS. FULL CABINET REPLACEMENT
Get the fresh, updated look of a new kitchen while keeping the cabinet boxes and layout that already work for your home.
CABINET REFACINGÂ
FULL CABINET REPLACEMENT
✓ Keep existing cabinet boxes & layout
​
✓ New custom doors & drawer fronts
​
✓ Exterior surfaces professionally refaced
​
✓ Less demolition & disruption
​
✓ More cost-effective when existing cabinets are suitable
​
✓ Typical full-service refacing: 2–3 days*
​
✓ Fresh, completely updated look
Existing cabinets are removed
​
New cabinet boxes, doors & drawers
​
Full cabinet replacement
​
More extensive removal and installation
​
Typically a larger overall project
​
Usually a more involved project
​
Completely new cabinetry
*Typical 2–3 day completion applies to many standard full-service refacing projects. Actual project time varies based on kitchen size, condition and scope of work.
01 — MORE COST-EFFECTIVE
Keep the cabinet boxes
that are already working
for you and invest in the
surfaces, doors, hardware
and details that create
the new look.
02 — LESS DISRUPTION
Avoid completely gutting
your kitchen. Refacing focuses
on updating the existing
cabinetry with significantly
less demolition.
03 — KEEP YOUR EXISTING LAYOUT
If you already like the
functionality of your kitchen, there’s no need to start over.
Keep the layout and transform
its appearance.
04 — QUICK TURNAROUND
Many of our typical full-service
kitchen refacing projects can be completed in approximately
2–3 days, depending on the size
and scope of the project.
OUR FULL-SERVICE REFACING PROCESS
FROM EXISTING CABINETS TO A COMPLETELY NEW LOOK
01 — PREPARE
Existing doors, drawer fronts and hardware are removed. The cabinet boxes are carefully cleaned and prepared for the new refacing materials.
02 — REFACE THE CABINET BOXES
High-pressure laminate (HPL) is professionally applied to the exposed face-frame surfaces, while matching finished panels are installed on visible cabinet sides.
03 — INSTALL NEW FRONTS & COMPONENTS
New custom-made cabinet doors and drawer fronts are installed along with hinges, hardware, moldings and selected components.
04 — ADJUST & COMPLETE
Doors and drawers are aligned and adjusted, hardware is checked, and finishing details are completed for a clean, coordinated appearance.
EVERYTHING WORKS TOGETHER
The HPL, finished side panels, doors and drawer fronts are selected to coordinate, creating a consistent new exterior while the original cabinet interiors remain in place.
01 PREPARE → 02 REFACE → 03 INSTALL → 04 COMPLETE
 01        PREPARE
​
02Â Â Â Â Â Â Â Â REFACE
​
 03        INSTALL
​
   04       COMPLETE